01 - Hongwen high school view
02 - Eagle rack erection operations
03 - The original paint layer to remove the operation
04 - Construction of steel components set out, wash hole to complete
05 - Foundation excavation is completed
06 - New base bar planting operations
07 - New base bar reinforced bandage
08 - New base pad before filling
09 - C-shaped steel positioning installation
10 - Assembly of wall assembly
11 - Assembly of wall assembly
12 - Foundation seat grouting is completed
13 - Beam steel plate reinforcement operations
14 - EPOXY perfusion seal
15 - Base without shrinkage cement infusion
16 - C-type steel plate
17 - Piston wall group painting operation
18 - Piston wall group painting operation
19 - Original decoration decoration surface recovery operations
20 - The system is completed
21 - The system is completed