PU Sealant Joint (Vertical surface joint sealant used only: sealing, anti-shock, superior flexible)

Powder Waterproof and Heat Insulation Material

Deion

Powder waterproof and heat insulation material is made from the ed natural ores that is ground with the ultra-fine vertical rolling wheel grinder and filtered by ultra-micro stream powder concentrator and finally processed by special processor. The whole grinding process is controlled by computer PLC, so its quality is very stable.

Grinder

Vertical rolling wheel grinder

Integration machine

Features

1. All-in-one Construction: The construction can achieve the waterproof, leakage prevention and thermal insulation and so on. It can be applicable to any old or new floor surface that whether is used with any waterproof and insulation materials without knocking out these materials and will not damage the main structure.
2. Full Control of Time: Except the raining days, it can be applied in any weather.
3. Automatic Leakage Trapping: With high flowability, it can automatically fill up the new cracks and fissures after the completion of the construction such as the crack of the floor surface caused by earthquake or formed as the waterproof material is impacted by external force.
4. Visible Effects: The temperature differences of the top floor before and after the construction can be clearly experienced.

Construction Process

Material submitted for examination  >>  Surface cleaning  >>  Water cut-off of the corner /roof drain application  >>  Materials on site/distribution  >>  Pave powder/material leveling  >>  Pave/nail PP sheet  >>  Subsection inspection for the thickness of the paving powder  >>  Grouting  >>  drain slope construction and overall polishing  >>  add cover on the roof drain  >>  cut cutting joints  >>  Completion

Surface cleaning

Pave powder/material leveling

Pave powder/material leveling

Pave PP corrugated plywood

Grouting/Polishing Completion

Cut cutting joints

Working Drawing

1. Cleaning
(1) Clean the surface and structural layer prior to application.
(2) The surface shall be free from dirt.
(3) Lines on the surface shall be firstly lifted up or moved away.

2. Treatment prior to construction
(1) Plant 2~3 cm groove in the corner, apply appropriate water to moisten the surface without standing water and spray the deep penetrating seal of the cement.
(2) The part around the roof drain shall be made watertight and sealed with sticky nonhardening waterproof latex.

3. Waterproof construction
(1) Use powder waterproof and insulation material.
(2) Coat 20 kg/M2 powder waterproof and insulation material with compact thickness of about 1 cm.
(3) Pave and nail 5mm PP sheet on the surface of the powder waterproof and insulation material.
(4) Pour 5~7cm cement on the nailed 5mm PP sheet.
(5) Make a drain slope in the surface of the cement.

The General Construction Diagram

The Construction Diagram for The Roof Drain

The Comparison of the Waterproof materials

Item/Material Powder
Waterproof
and Heat
Insulation
Material
PU Thermal
Waterproof
Blanket
Elastic
Cement
Acrylic
Adhesive
Iron
Roof
Waterproof Excellent Good Good Good Good Good
Heat Shielding
Performance
Very Good No No No No OK
Easy
Construction
Simple Plain
Weather
Plain
Weather
Plain
Weather
Plain
Weather
Complex
Automatic
Trapping
Yes No No No No No
Environmental
Protection
Yes No No No No Recyclable
Flame
Resistance
Yes No No No No Yes
Price Middle High Low Middle Low Middle High
Service Life 1~5 Years 1~5 Years 1~5 Years 1~5 Years 1~5 Years 10 Years